| Code | C.2.2.5 |
| Level | 3 |
| Name (en) | Initiate permanent disturbance recovery |
| Documentation (en) | The ability to bring the energy grid 'into standard operation' after maintenance or to bring it back in the aftermath of a failure. |
| N3 waardestroom C.D2 | |
| N3 capabilities | |